Question an-ins
1.1 Linear Functions - Rate of change applications
0:00
An inspector begins a day of work with a large sample of shirts that need to be checked for defects. The inspector works at a constant rate throughout the morning. What type of model is best to model the number of shirts remaining to be checked for defects at any given time throughout the morning?
A.
An exponential growth model
B.
An exponential decay model
C.
A linear model with a positive slope
D.
A linear model with a negative slope
